Home » News » High-speed turbocompressor Sulzer HST for the Pskov WWTP

High-speed turbocompressor Sulzer HST for the Pskov WWTP

The equipment will be supplied to the Pskov WWTP under the project “Economically and Environmentally Sustainable Region of Lake Peipsi 2” of the Cross-Border Cooperation Program “Russia – Estonia 2014-2020”. The turbocompressor will be installed in the air blowing station №2 to provide airflow to the aeration tank with high efficiency. In 2021, GSP-Project Ltd already supplied Sulzer HST turbocompressor to the air blowing station №1..