Home » News » PUMP START, SPS-124, NOVOKUZNETSK.

PUMP START, SPS-124, NOVOKUZNETSK.

In 2013 GSP-Project Ltd started cooperation with ZAO (Private Limited Company) “Vodokanal”, Novokuznetsk, Kemerovo region. In the middle of February 2015 the renewed pump was successfully started, having replaced old-fashioned equipment.

As a part of modernization Submersible Sewage Pump Type ABS XFP301M (75 kW, 1142 m3\h) with monitoring system and controller, which is able to control four pumps station was provided. Renewed pump is the one of four pumps used at the station nowadays.

The main target of SPS-124 modernization was to achieve optimum performance of water supply for the operation of the pumping station, as well as to reduce energy consumption and to provide the maximal margin between the available and required NPSH. The Submersible Sewage Pump Type ABS XFP was chosen due to the SPS’s complicated operating regime, unstable incoming wastewater and reliability requirements for the equipment.

The “Vodokanal”, Novokuznetsk is a successful and prosperous establishment, whose success is not achieved by chance, but as a result of the work of great specialists, the proper repair base, the experience of work with imported pumps of the world’s leading manufacturers. “Vodokanal” generates the business processes taking into account the long-term development perspectives, and on the basis of the principle of total costs reducing.