GSP-Project Ltd, together with the manufacturer’s plant, carried out preventive maintenance of one Sulzer HST turbocompressor to extend the life cycle and provide an additional guarantee for the equipment. Sulzer HST high speed turbocompressors have been in operation on site sinc Назад
(March 23, 2021)
GSP-Project Ltd won tender to supply of the Sulzer HST30 high-speed turbocompessor. The equipment will be supplied to the Pskov WWTP under the project “Economically and Environmentally Sustainable Region of Lake Peipsi 2” of the Cross-Border Cooperation Program “Russia – Estonia 2014-2020”. The turbocompressor will be installed in the air blowing station to provide
(February 15, 2021)
GSP-Project Ltd experts conducted diagnostics of six high-speed turbocompressors at the Ivanovo WWTP. Diagnostics after 1 year of operation is standard procedure of guaranty service, the term of which is 36 months. According to the results of the diagnostics, it was revealed that all the units are operating in regular mode in full compliance
(January 25, 2021)